← Back to Blog
Infrastructure · 8 min read

The Broadcom VMware Price Increase: What a Ten-Server Business Can Actually Do

Your VMware renewal doubled and you did not add a single VM. Why the Broadcom licensing changes hit small estates hardest, the three realistic responses, and what the move to Proxmox looks like when you keep the hardware you already own.

Neatly cabled switches in a rack — the hardware stays; the hypervisor licence is what changes.
Photo: Taylor Vick on Unsplash
, Phoenix Network Solutions
On this page

The quote arrives in the same envelope it always has. The number is not the same. You have the same two or three hosts, the same ten or fifteen virtual machines, the same Windows servers doing the same jobs, and the annual figure has doubled, or tripled, or in some cases gone up by more than that.

Nothing you did caused it. This post is about what did, what your realistic choices are, and what the most common answer, moving the same workloads to Proxmox on the hardware you already own, actually involves.

What changed, in order

Broadcom completed its acquisition of VMware in late 2023 and reworked the licensing through 2024 and 2025. The facts every reseller and every trade source agree on:

Perpetual licences are gone. You cannot buy vSphere once and pay for support any more. Every renewal is a term subscription, which means every renewal is a chance for the price to move.

Licensing is per core, with a 16-core minimum per CPU. A two-socket server with eight-core processors is licensed as 32 cores, not 16. For a small estate on modest hardware, trade sources put the effect at roughly two and a half to five times the previous per-socket figure before any list-price change at all.

The small-business editions were retired. vSphere Essentials Plus, the bundle a ten-server business typically ran, was withdrawn in late 2024. The entry tier is now vSphere Foundation; the full stack is VMware Cloud Foundation, which bundles vSAN, NSX and the management layer whether or not you use them.

Minimum order sizes have been murky. In March 2025 distributors told customers that the minimum per order would rise from 16 to 72 cores. Several sources report it was withdrawn within weeks after the reaction; others still describe it as applied in some regions. Broadcom publishes no price list and has said little in public. The practical rule: get the minimums that apply to your quote in writing from your reseller, because the difference between 32 and 72 licensed cores is the difference between an annoying renewal and an impossible one.

Renewal timing has teeth. Resellers describe a surcharge of around 20% on the first year for renewals that miss the anniversary date. If your renewal is in the next ninety days, the clock is part of the decision.

The three realistic responses

1. Renew, and shrink the exposure

Sometimes the right answer is to pay. If you run software that is certified only on vSphere, or your team’s whole skill set is VMware and there is no appetite for anything else, renewing is defensible. Do it on your terms: license vSphere Foundation rather than Cloud Foundation if you are not using vSAN and NSX, consolidate onto fewer, denser hosts so you are paying for cores you actually use, and take the three-year term if a one-year quote carries a premium. Then put the next renewal on the calendar as a decision point, not a formality.

2. Move to a different hypervisor on the same hardware

This is where most small and mid-size estates we see end up. The servers are fine. The virtual machines are ordinary Windows and Linux guests. The only thing with a licence problem is the layer underneath them, and that layer can be replaced.

Proxmox VE is the one we recommend for most: open source, KVM-based, with live migration, ZFS replication and a built-in backup product, running on the hosts you already own. Nutanix AHV is the commercial alternative when a business wants an enterprise vendor on the other end of a support contract. Which one fits depends on the team, not the margin.

What it involves, honestly:

  • An inventory and a written cost model first. Every VM, every host, every core, what the VMware renewal would be against what the alternative costs including support. Our illustrative model for a 50-VM estate on existing hardware, roughly $21,600 a year on per-core vSphere against roughly $5,500 a year on supported Proxmox with backup included, is on the VMware migration page. Your figures will differ; the shape will not.
  • Migration in waves, with rollback at every step. A VM is converted and brought up on the new platform while the original stays on VMware, untouched, until someone signs off that it runs clean. Nothing is decommissioned on faith.
  • Backups change too. Proxmox Backup Server replaces whatever you paid separately for VM backup. Test a restore before go-live, not after.
  • The team learns a new console. This is the real cost for a business with one IT person. Budget training time, or have someone run it for you.

3. Move the workloads off your hardware entirely

If the hosts are five years old and due for refresh anyway, the hypervisor question becomes a hosting question. The same VMs can be copied as-is onto dedicated hardware in a data center, with the hypervisor licence, the patching, the backup and the on-call inside one monthly number for a two- or three-year term. Armellini Express Lines made that move when its previous host closed, and has since carried its environment through Windows Server generation upgrades without a refresh project of its own. What is inside the number is on the managed hosting page.

This is the answer for a business that would rather not own a server room at all. It is not the answer if the hardware is new and the only problem is the licence; in that case, option 2 costs a great deal less.

Deciding in one meeting

Four questions, asked in order:

  1. What are we actually paying for? Get the itemised renewal. If it is Cloud Foundation and you have never touched vSAN or NSX, that alone may halve the number.
  2. How old are the hosts? Under three years: keep them, change the hypervisor. Over five: the licence is the trigger to decide where the workloads live next.
  3. Does anything we run require vSphere? Check with the application vendors, in writing. Most line-of-business software runs on a Windows VM and does not care what is underneath.
  4. When is the renewal date? If it is inside ninety days, the sequence is: short renewal or lapse-risk assessment now, migration plan immediately after. Do not let the surcharge make the decision for you.

The part that is not about VMware

The companies hit hardest by this are the ones that discovered they had no exit. The licence was perpetual, the renewal was a formality, nobody had looked at the alternatives in ten years, and then the terms changed from the other side. Whatever you choose this time, choose it with the exit written down: how you would leave, what it would cost, how long it would take. That is the lesson, and it applies to the next vendor as much as this one.


Phoenix migrates vSphere estates to Proxmox VE and Nutanix AHV on existing hardware, and hosts Windows workloads on its own dedicated hardware in a SOC 2 Type II data center in Fort Lauderdale. Start with a written TCO model built on your real core count: request a free TCO audit. Broward County and South Florida: managed IT in Fort Lauderdale. Sonoma, Marin and Napa: IT consulting from Rohnert Park.

Tags: VMwareBroadcomProxmoxVirtualizationCost

Talk to a senior engineer about your infrastructure.

No sales pitch — a real conversation about your stack, your regulators, and whether we're a fit. 45 minutes, on your calendar.